10.26.2013

Project proposed by the river side

2 comments:

Anonymous said...

This will certainly contribute to the traffic jam at peak hours. Link to the application on the One Stop Centre (OSC) site http://www.epbt.gov.my/osc/Proj1_Info.cfm?Name=468478&S=S

Anonymous said...

There is silt from the development flowing into the river behind Jalan SS21/42A. This will cause the river bed level to rise and possible risk of flooding