7.31.2013

Complimentary ONECARD membership for Damansara Utama Residents

To: Damansara Utama Residents and Owners Association,

 

Greeting from ONECARD, 1 Utama Shopping Centre!

 

First of all, let me introduce the ONECARD Loyalty Card to your goodself. ONECARD is the Bandar Utama Privilege Card and can be used at more than 600 participating outlets found across 1 Utama Shopping Centre, Centrepoint, One World Hotel and The Club @ Bukit Utama. Members get to earn UPoints for their spending at the participating outlets and UPoints accumulated in their ONECARD are actually cash rebate and can then be used to redeem for purchases, meals, services & entertainment.

 

ONECARD can also be used as a parking card where members will get to enjoy cheaper parking rates and also entry to members-only parking at the ONECARD Preferred Parking or Platinum Parking.

 

Hence, we know that Damansara Utama is within the vicinity of Bandar Utama, we would like to offer complimentary ONECARD with 3 years membership to residents of Damansara Utama. Appreciate if you could allow us to extend the privilege to your residents.

 

Attach herewith some information of ONECARD for your easy reference.

 

Should there be any queries, please do not hesitate to contact me.

 

Hope to hear from you soon.

 

 

Thank you!

 

 

Best Regards,
Sook Mei
ONECARD Marketing

 

1 Utama Shopping Centre
4th Floor Highstreet
No.1, Lebuh Bandar Utama
Bandar Utama City Centre
Bandar Utama
47800 Petaling Jaya, Selangor
Tel:     +603 7726 4788
Fax:     +603 7722 5788

 


7.26.2013

Raya Gate Closure

Fot reasons of beefing up the security during the Hari Raya festive, Zone B2's access via road SS22/42 will be closed from 8~11 Aug. Gate will be opened again Mon 12th Aug at 7am onwards.

7.25.2013

Sound Dampeners along LDP flyover

Somehow and with not much reason Litrak did the correct thing: by erecting sound dampeners along the flyover which was initially promised but then long overdue.

Why it took so long? This should be their top most priority! Was it because of pressure by DOE after our 2~3 complaints to the Department with the sound study evidence?

7.07.2013

Attention: Security Warning

A friend's neighbour in DJ zone A got robbed in front of her hse last night, man on motorbike despite having guards.

Need to warn our guards not to let ppl on motorbikes in unless they can prove legitimate purpose of visit and/or business.

Please be careful getting in/out of your hse too

6.23.2013

DUROA Annual General Meeting, with Presence of YB Yeo Bee Yin

6.14.2013

TEMPORARY CLOSURE OF TOLL PLAZA 'A' AT PETALING JAYA SELATAN TOLL PLAZA ON LEBUHRAYA DAMANSARA-PUCHONG (LDP E11)/ PENUTUPAN SEMENTARA PLAZA TOL 'A' DI PLAZA TOL PETALING JAYA SELATAN, LEBUHRAYA DAMANSARA-PUCHONG (LDP E11)

>  
>
> TEMPORARY CLOSURE OF TOLL PLAZA 'A' AT PETALING JAYA SELATAN TOLL PLAZA ON LEBUHRAYA DAMANSARA-PUCHONG (LDP E11)

Providing a pleasant and comfort journey on Lebuhraya Damansara-Puchong has always been one of the objectives of LITRAK in all of its highway enhancement projects.

In line with that, LITRAK will be closing the Toll Plaza 'A' (from Sunway to Puchong/KESAS bound) to all class of vehicles to facilitate the Traffic Studies which will be carried out from 17-21 June 2013 (Monday – Friday) from 6.00 am to 10.00 am. Highway users from Sunway heading towards Puchong/KESAS are advised to use Toll Plaza 'B' to their respective destination.

Highway users are advised to follow the signs posted and Litrak would like to apologize to highway users for any inconvenience caused. For any traffic info, please call our LDP Helpline at 03-7494 7333.

Thank you.

LITRAK COMMUNICATIONS DEPARTMENT
KOMPLEKS OPERASI LITRAK
KM 19, LEBUHRAYA DAMANSARA-PUCHONG
47500 PETALING JAYA
SELANGOR DARUL EHSAN

T: 03-7494 7000
F: 03-7494 7016
>
>  
>
>  
>
> PENUTUPAN SEMENTARA PLAZA TOL 'A' DI PLAZA TOL PETALING JAYA SELATAN, LEBUHRAYA DAMANSARA-PUCHONG (LDP E11)
>
>  
>
> Syarikat konsesi kepada Lebuhraya Damansara-Puchong (LDP) akan membuat penutupan sementara Plaza Tol 'A' di Plaza Tol Petaling Jaya Selatan (dari Sunway ke Puchong) bermula daripada 17hb hingga 21hb Jun 2013 (Isnin – Jumaat).
>
>  
>
> Penutupan sementara untuk semua kelas kenderaan ini adalah bertujuan untuk melaksanakan kajian trafik bermula dari jam 6.00 pagi hingga 10.00 pagi. Para pengguna LDP dari Sunway menghala ke Puchong/KESAS adalah dinasihatkan supaya menggunakan Plaza Tol 'B' untuk menuju ke destinasi mereka dan mematuhi arahan papan tanda keselamatan.
>
>  
>
> Untuk sebarang pertanyaan, sila hubungi Talian Bantuan LDP di 03-7494 7333. Litrak ingin memohon maaf kepada para pengguna LDP di atas sebarang kesulitan.
>
>  
>
> Sekian, terima kasih.
>
>  
>
> JABATAN KOMUNIKASI LITRAK
>
> KOMPLEKS OPERASI LITRAK
>
> KM19, LEBUHRAYA DAMANSARA-PUCHONG
>
> 47500 PETALING JAYA
>
> SELANGOR DARUL EHSAN
>
> T: 03-7494 7000
>
> F: 03-7494 7016
>
>  
>
>  
>
>  
>
>
> --
> This message has been scanned for viruses and
> dangerous content by MailScanner, and is
> believed to be clean.

6.02.2013

MRT: Trial Partial Road Closure of Slip Road at LDP (3 June to 9 June 2013)

Dear Sir/ Madam,

 

We would appreciate it if you could communicate this information to your residents/ employees especially to those wishing to access Jalan Damansara from LDP.

 

Thanks and regards,

 

Press Release Video on Sg. Penchala River

承包商马虎清河道 淤泥堆河岸居民怕水灾

承包商马虎清河道 淤泥堆河岸居民怕水灾

  • 水利灌溉局的承包商把河床里挖出的淤泥堆积在河岸, 一旦下雨就流回河中。

(吉隆坡1日讯)水利灌溉局承包商马虎清理河道工程,在挖掘河床后,却将淤泥堆在河岸,居民担心下雨时淤泥会流入河中,继而引发水灾。

早前在白沙罗乌达马大淹水事件获得水利灌溉局的关注及承诺在卡尤阿拉河进行河道清理工程,但是其委任的承包商工作态度草率,仅将河床里挖出的淤泥,甚至是枯树堆积在河岸。

当地居民发现此情况后,感到不满,于是向百乐镇区候任州议员杨美盈投诉,希望有关当局能够敦促承包商继续工程。

杨美盈今天连同居民一同实地考察,她指出,若是下雨时,堆积在河岸的淤泥若冲回到河中,并没有解决到该区淹水的问题。

她指出,当地的居民昨日已把对此事的投诉信件呈交给水利灌溉局,不过她今天也会以州议员的身分发信给当局,一来促承包商继续展开工程,二来促他们把堆积在河岸的淤泥清理,同时并要建筑河提,以防止淹水事件重演。


不过她强调,她呈交信件的用意并非责怪水利灌溉局,而是希望他们能够继续工程。


恐捷运工程加剧坍塌 居协盼修复河堤

SS21花园居民协会主席拉杰斯解释,卡尤阿拉河在下大雨时,水位上升得很快,这造成在4月杪发生前所未有的水灾,水淹至路面,并涉及到42A区住宅单位。


承包商应认真看待

他指出,在淹水事件发生后,水利灌溉局主任拿督阿末胡沙尼与居民会面,并由其代表嘉马委派现在的承包商。

“水利灌溉局的承包商工作态度并不是我们想要的,我希望该局能够确保他们认真工作。”

他也希望该局也一并修复卡尤阿拉河倒塌逾两年时的河堤,因为下个星期起这里就要开始捷运工程,这工程将会加剧河堤倒塌的现象。

另外,他也希望当局把堆积在河岸的淤泥搬走,并且种植树木,以防止河岸再受侵蚀。


6.01.2013

3rd Meeting with MRT (on site of Pillar 08 + 09)

The event was on 30th May, Thursday at 5.30pm. It was a very good session. Many residents showed up.

All parties from KVMRT were present i.e. MRT Corp, MGJV (PDP), and Mudajaya (main contractor).

Discussions were in reference to concerns brought up during the #2nd Meeting. There were impromptu Q+A with residents particularly with those staying nearer to the track.

Some additional concerns were raised. The main one was about the clearing of land and cutting of the old trees. Residents request MRT to start planting back some fast growing trees (monocotyledon types e.g. Bamboo, Palm, etc) around the perimeter barricade to "Green" back the area. These Greens, besides from being able to improve the aesthetic surrounding, can also greatly help to act as natural Silt Traps, Noise Dampener, and to reduce reflected heat from the metal barricade and barren surrounding.

Session adjourned at around 7pm with parties promising to come back on some outstanding issues. Also we have agreed to hold another follow up meeting (#4th Session) sometime in Sept '13 ie after Hari Raya.

Key timeliness for the project that will affect us is the construction of the pillars. This is anticipated to start by around Aug '13~Sept '13. The next follow up session then will be timely.

5.22.2013

Residents want solution for Sungai Kayu Ara’s erosion problem

Residents want solution for Sungai Kayu Ara’s erosion problem

By VINCENT TAN
vincent.tan@thestar.com.my

THE banks along Sungai Kayu Ara, particularly behind Jalan SS21/42A, are eroding and residents are worried about flashfloods occurring the next time there is a downpour and the river overflows.

“Residents have been complaining to the Drainage and Irrigation Department (DID) about this problem for the past 10 years but nothing was done until recently when the department promised to send a contractor to carry out remedial works last week.

“However, this also came to nothing as the contractor failed to show up,” said Damansara Utama Residents and Owners Association president Rajes Patel.

He said residents found this out when they called the DID to check and were told that the previous contractor’s services had been terminated and a new one appointed.

The residents were told the new contractor would come yesterday to rectify the problem.
 
“Once again, no one came,” said Rajes.
The residents also said that during the recent rainy spell, water levels at the river had risen.

“Luckily, we are in the middle of a dry spell.

“Otherwise, we have to worry about floods,” he said.

Damansara Utama assemblyman Yeo Bee Yin said besides Jalan SS21/42A, Kampung Cempaka, which was further downstream, was also at risk of flashfloods due to erosion problems at Damansara Utama.
“Currently, the short-term plans that residents discussed with DID involve dredging the river bed, which has become shallow due to silt.

“However, a long-term, holistic plan is needed to resolve the problem,” said Yeo.

She said additional funding from the Federal Government would be necessary for this, adding that the Selangor DID only had a budget of RM50mil, allocated for maintenance of all the rivers in the state.
Residents M. Selvaraj and Phyllis Teh said the collapsed section previously had a gabion wall to check erosion, but it had since been washed away.

“In fact, a tree, that was uprooted when the banks collapsed seven years ago and fell into the river is still found stuck there.

“This says a lot about the lack of maintenance,” said Teh.

A call to the state DID revealed that the new contractor had already received his letter of appointment and had been given approximately one month to repair the collapsed banks as well as dredge the river bed.

5.21.2013

Meeting with YB Yeo on issues of Sg Penchala

 



#3rd Meeting with MRT at Site Discussion (SS21/42) on 30th May 2013, Thurs at 5.30pm

Dear Members,

Please be informed that MRT Corp, MGJV (PDP), and Mudajaya (Contractor) of the KVMRT will be holding another meeting session with us (#3rd) with details as specified;
Date      :               Thursday, 30 May 2013
Time      :               5.30 pm
Venue  :               Entrance of Worksite along Jln SS21/42

Do make time to join in order and support our effort in making sure all your interest as stakeholders are safeguarded. 



--
This is an automatic update from the DU21 Residence Community Website at http://du21r.blogspot.com

Gathering with Ms Yeo Bee Yin (ADUN) and Media to resolve river issue at SS 21/42A, Damansara Utama

Dear all,
This is to inform that Yeo Bee Yin (ADUN for Damansara Utama) be visiting the river site at SS 21/42A, Damansara Utama,  together with the residents with reported rising river level issue and a promised project to start by JPS on 13 May but still no action taken.
Date: 22 May 2013 (Wednesday)
Time: 10am
Place: Ss21/42a, Damansara Utama , 47400, PJ (meet in front of nursery)
Contact Person: Terrence Tan: 016-6341910
Dear Residents of Damansara Utama - Please attend this gathering with Ms Yeo Bee Yin, if you are able to. More residents would promote the seriousness of this issue and hopefully expedite recitification works for the river behind SS 21/42A.

Litrak doing on 23.05.2013 from 12.00am until 6.00am: Tree pruning along the LDP


We would like to inform you that, Litrak's maintenance team will be carrying out routine tree pruning works along the noise barrier in front of Jalan SS21/44.

The works will be carried out on the 23/5/2013 from 12.00 am until 6.00am. Flyers to notify the residents staying along Jalan SS21/44 will be distributed today. For any enquiry, please call our LDP Helpline at 03-7494 7333. Sample of the flyers has been attached for you reference.

Thank you.

Regard's

Partiban.P
Communications Department, LITRAK
Tel.: 03-7494 7014     Fax: 03-7494 7016



5.15.2013

Sign board to be taken down

Just noticed that the contractors are finally here to take down the giant sign post.

MBPJ contractors to trim trees

Finally, the MBPJ contractors are here to trim the trees following our complain that those along road SS21/42 are too high.

5.14.2013

A note on security for your attention

Luminous vest for DUROA

5.12.2013

Meeting with Mudajaya (Contractor for MRT)


Representative from Mudajaya was present on site to record our complaint on the fallen trees, un-built barricades, security etc. 

Also, we have been pushing for the 3rd meeting with them.

It was suggested to this months, and gathering with stake holders to be held at site.